水泥匀质板常用解决方案
来源:2592作者:2020/9/16 9:16:00






轻匀质保温板制作流程

Production process of light uniform quality assurance temperature plate:

1. Raw materials such as cement and fiber are proportioned and pulped by the proportioning system, so that the raw materials are fully mixed and kept uniform.

2. Transport the slurry to the slurry storage tank, keep stirring to keep it uniform, send the slurry to the slurry storage tank and then to the headbox, and mix in the headbox to keep uniformity.

3. The billets fall off from the slurry forming cylinder, and are transported to the irrigation cutting place by the billet receiving machine. The longitudinal cutting edge of the billets is cut by the cutter. The residual materials are transported to the return mixer by the billet receiving machine, and then transported to the slurry storage tank for reuse after being stirred by the mixer.







匀质板的施工条件和环境

荣锦匀质板为您简单介绍施工条件与环境:

基层墙体:经过工程验收达到国家验收质量标准的结构承重墙面或非承重墙面在找平层施工完毕后,待找平层干燥并已验收合格,即可进行外墙外保温施工。

门窗口:门窗洞口经验收,洞口尺寸位置达到设计和质量要求。

窗的保温:门窗的保温要按要求做特别的处理,应严格按照设计要求施工。

伸缩缝和装饰缝:伸缩缝的蕞大间距应符合图集的要求或与设计单位协商确定。

预埋管道:与外墙有关的管线、预埋件、支架等已安装到位,并预留出外保温的余地。

环境条件:施工现场环境温度和基层墙体表面温度在施工及施工后24小时内均不得低于5℃,风力不大于5级,雨天不能施工。






?匀质板保温系统的安装注意事项

匀质板保温系统现浇外墙保温系统施工与控制都有哪些呢?相信很多朋友都不知道这方面的详细信息,别担心,今天就让小编来为你介绍一下匀质板在这方面的相关知识吧!

匀质板保温系统的安装注意事项

安装内外模板主次楞,固定内外模板及主次楞,调整模板位置及垂直度符合施工要求。混凝土浇筑应采用∏型镀锌铁皮扣在匀质改性防火保温板浇筑上口形成保护帽。混凝土性能应符合设计要求。内外侧竹(木)胶合模板拆除时间按有关规定进行。砌筑外围护结构填充墙自保温砌体,自保温墙体外侧应与匀质改性防火保温板处于同一垂立面上。

匀质改性防火保温板与自保温砌体墙面交接处,匀质改性防火保温板阴阳角,应采用***抗裂砂浆找平并铺设200mm宽耐碱玻纤网布进行抗裂处理。匀质改性防火保温板与自保温墙体外侧整体抹面层施工。